|
New zone 81 KB, approx. 16 seconds at 56.6Kbps |
|
LF-114 75 KB, approx. 15 seconds at 56.6Kbps |
|
G Zone High Grade Structures Projected SE Extension 56 KB, approx. 11 seconds at 56.6Kbps |
|
LF-112 Drilling Under LF-103 53 KB, approx. 11 seconds at 56.6Kbps |
|
G Zone SE Extension 65 KB, approx. 13 seconds at 56.6Kbps |
|
Location of zones 154 KB, approx. 30 seconds at 56.6Kbps |
|
T11 - Geochem 130 KB, approx. 25 seconds at 56.6Kbps |
|
T11 Zone 181 KB, approx. 35 seconds at 56.6Kbps |
|
Core Shack 120 KB, approx. 23 seconds at 56.6Kbps |
|
Amphitheatre Zone Drilling 248 KB, approx. 47 seconds at 56.6Kbps |
|
T-11 Zone 161 KB, approx. 31 seconds at 56.6Kbps |
|
Mina Bagual old workings 113 KB, approx. 22 seconds at 56.6Kbps |